There are numerous techniques of evaluating an investment which might be typically used by managers in both personal corporations and public corporations

There are numerous techniques of evaluating an investment which might be typically used by managers in both personal corporations and public corporations. Every of these measures is meant to be a sign of profit for a project or investment. Some of these measures imply the scale of the profit at a particular point in time; others provide the rate of return in line with period while the capital is in use or when reinvestments are included. This section of the essay will discuss the internal rate of return (IRR), payback period (PBP) and the net present value (NPV) approaches for a project evaluation.

The internal rate of return (IRR)
“The internal rate of return is the interest rate at which the net present value of all the cash flows (both positive and negative) from a project or investment equals zero” (investinganswers.com), meaning IRR is the rate of return that makes the sum present value of future cash flows and the final market value of a project (or investment) equals its current market value. The higher a project’s internal rate of return, the extra desirable it is to adopt the investment or project.
Ross (2013) calls IRR, the most important alternative to NPV and Graham (2001) said it’s the most used measure for evaluating projects. Graham (2001) claims that in 2001 75,6 percent of CFOs use the IRR method when comparing and deciding between capital projects. “The basic rationale behind the IRR method is that it provides a single number summarizing the merits of a project” (Ross 2013). It doesn’t depend on anything except the cash flows of the project, because the number is internal or intrinsic. It is pretty similar to the NPV formula:

We Will Write a Custom Essay Specifically
For You For Only $13.90/page!


order now

IRR can be mathematically calculated using the formula:
C0+c11+r1+c21+r2+c31+r3+cn1+rn=0
In which
C0 – the cash outflow generated in length No= zero
C – the cash flow generated in the particular duration (the last duration being ‘n’).

IRR, denoted via ‘r’ is to be calculated with the aid of employing trial and blunders method or use built-in functions from excel.

There are several advantages when it comes to the IRR. But the main aspect is that it provides a need that NPV doesn’t; a rule that summarizes the information of a project in a single rate of return. A big plus is that it takes the TVM into consideration unlike the payback period method. After calculated, it is very simple to interpret and therefor easy to visualize for managers.

The main disadvantage is that the economies of scale are ignored. A second disadvantage is one that arises when there are conventional cash flows. In those cases the NPV will equal zero more than one time, which will lead to multiple IRRs. In these cases the IRR method simply cannot be used here. Actually, To deal with this difficulty, a modified internal rate of return is regularly used.

A third disadvantage to the IRR method is that it has impractical implicit of the reinvestment rate. Even though it is rarely the case where a firm has the same reinvestment rate, the IRR method implies this. It continues to assume that the firm will make another investment at the same rate even though that is close to impossible.

The payback Period
The payback period is described as the time required to get back the initial funding in an investment or project. The payback period technique of financial appraisal is used to evaluate capital initiatives and to calculate the return per year from the start of the investment till the accrued returns are identical to the value of the funding at which point the funding is said to had been paid back and the time taken to attain this payback is called the payback period. Longer payback periods are typically not desirable as investment options for most firms.

The payback approach is computed as follows:
Payback Period= Initial InvestmentCash Inflow per Period

The payback decision rule states that proper invesatments need to have less than maximum payback period chosen by management (Berk and DeMarzo, 2017). Payback is said to emphasise the management’s challenge with liquidity and the want to reduce risk via a rapid recovery of the initial funding. It’s frequently used for small expenditures which have apparent benefits that the usage of extra sophisticated capital budgeting strategies isn’t required or justified.

Lets quickly look at an example to how the payback period method works. Say a firm is handed a project where the initial investment is £50,000, and the cash flows for the next 5 years are £10,000, £20,000, £12,500, £7,500 and £15,000 respectively. This can be shown in Table I:

Table I
Year 0 1 2 3 4 5
Cash Flow(£) -50,000 10,000 20,000 12,500 7,500 15,000

We can also write down investments like the preceding with the notation:
(-£50,000, £10,000, £20,000, £12,500, £7,500, £15,000)

From the table we can see that the investment period would be after 4 years as £10,000 + £20,000 + £12,500 + £7,500 = £50,000. By looking at the multiplication on the last sentence it shows how easy it actually is to calculate the payback period, which is one of its biggest advantages. It allows the managers evaluation process to be done within a relative short time. Companies with limited cash are usually looking for the fastest recovering projects, as it will enhance the reinvestment possibilities for such firms.

However since the payback period method is so simple it is no surprise that it comes with a lot of flaws and shortcomings. The two biggest disadvantages for the PBP method is that it doesn’t take the timing of cash flows into consideration and it ignores the cash flows after the payback period. Let’s start with the first disadvantage.

If we compare project I and project II, where both have a payback period of 2 years. But project I has a cash flow of £80,000 the first year and £160,000 the second, while the cash flows for project II are £160,000 for the first year and £80,000 for the second. Since the large cash flows come first for project II, the net present value of the project is considerably higher even though the payback period for the two projects are identical. Hence the problem will be that when comparing the two projects with each other using the payback period it will be impossible to tell which one is better, while the NPV approach will show differently.

The second disadvantage is, as said earlier, that it ignores cash flows after the cut-off date. Again, lets use the example from Table I earlier and call it project A, and we add another project called project B. The cash outflows and inflows will be as the following:

Table II
Year 0 1 2 3 4 5
Project A (£) -50,000 10,000 20,000 12,500 7,500 (Project A paid back) 30,000 (Not included in the payback method)
Project B (£) -50,000 17,250 15,000 17,250 (Project B paid back) – –

Here we can see that the payback for project B is after 3 years, while project A still has 4 years. Now if a company was to follow all their investment decisions only based on the payback period method, it would choose project B as it has the shortest payback period of 3 years. But if we add up all the cash inflows the company would get for the different projects, project Y would break even while project A will make a profit of £30,000. Therefor company has to use the payback period wisely, so it doesn’t miss profitable projects where the cash inflows continue long after the cut-off date.

A third disadvantage with the PBP method is that it doesn’t consider time value of money. There is no discount rate for the inflows that occur in the later stages.

NPV
The Net present value is as the difference between the prevailing present value of the cost inflows and the present value of the cash outflows. When computing the investment net present value, the cash flows going on at unique factors in time are adjusted for the time cost of money the usage of a reduction rate this is the minimum fee of return required for the project to be proper. As Ross (2013) states in his book, a project should be accepted if the NPV is greater than zero and rejected if it is less than zero.

The NPV is computed as follows:
NPV=n=0NCn1+rn
where
C – the Cash Flow generated in the specific period,
n – time index
N – the last period when cash flows take place
r – relevant discount rate
Note that higher NPVs are more desirable. The specific decision rule for NPV is as follows:
NPV ? 0, reject project
NPV ; 0, accept project

“Whilst making an investment choice, take the opportunity with the
Highest npv. Choosing this opportunity is equivalent to receiving its npv in cash today” (berk and demarzo, 2017). That is called the npv rule. But, if the npv is zero, the manager has to decide whether to simply accept or reject depending on numerous elements, including there might be a better investment to be made some other place that might produce better return. It will be a que of opportunity cost. The idea of the rule is if a firm accepts an investment with with positive net present value, it’s going to gain the shareholders, because the value of the firm will add (thinking about no different situations) by means of the amount of the npv. That is called additivity, this means that that the value of the company is truly the value of investement, or different projects in the firm.

An organization must not forget the idea of ‘time value of money’ (TVM). TMV means that if £1 is invested today in bank, with an interest of 7% per annum, in twelve months it’ll be £1.07 due to the fact the financial institution compensates the buyers for borrowing their money. Now if you reverse the equation. £1 in 12 months with the equal interest of 7% equals £0.9346 nowadays (Berk and Demarzo, 2017).

The primary advantage with the net present value approach in line with Ross (2013) is that is uses cash flows, it consists of all the cash flows of the project and that it rightly discounts the cash flows well. NPV can handle a couple of discount rate without any problems. Every cash flow can be discounted one by one from the others.

The main drawback to the net present value technique is that it’s sensitive to discount rates. By using surely adjusting a discount rate that is not possible to realize for sure is right or incorrect, a manager can move from creating a profit to losing. All of it depends on whether or not the investment is regarded as safe or not and from there, one may also determine on what discount rate may be handy. It makes a big drawback to the npv rule.
The npv excludes the value of any actual options which could consist within the investement and it does not take acknowledgement to the size of an investement.